2/25/2023 0 Comments Fission uranium stockFrom west to east, these zones are: R1515W, R840W, R00E, R780E and R1620E. Uranium mineralization of the Triple R deposit at PLS occurs within the Patterson Lake Conductive Corridor and has been traced by core drilling over ~3.18 km of east-west strike length in five separated mineralized "zones" which collectively make up the Triple R deposit. PLS Mineralized Trend & Triple R Deposit Summary Our feasibility study continues to move forward on schedule, most recently with the completion of geotechnical drilling on our four largest mineralized zones." Ross McElroy, President and CEO for Fission Uranium, commented, " Fission continues to deliver on our business strategy, advancing the high-grade, near surface PLS uranium project in Saskatchewan, Canada, while also strengthening our finances and balance sheet. A pumping well pulsed test was performed at the R840 zone from a deep pumping well drilled during Summer 2021 (see FCU news release September 27, 2021).R1515W Zone - 1 crown pillar and rock mechanics geotechnical drill hole.R840W Zone - 1 ventilation shaft rock mechanics geotechnical drill hole.R00E Zone - 1 crown pillar and rock mechanics geotechnical drill hole.R780E Zone - 3 crown pillar and rock mechanics geotechnical drill holes.6 geotechnical drillholes totaling 1044.2 meters:.Highlighted details of the drilling are as follows: Four zones of the Triple R deposit (R1515W, R840W, R00E and R780E) were the focus of the drilling and results will be used as part of the overall Feasibility Study (see News Release, January 25, 2022). The geotechnical drill program at the PLS site, utilizing a combination of sonic and core drilling of 6 large diameter HQ drill holes has been completed successfully. Winter 2022 Geotechnical Drilling Completed
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |